Aker Solutions

Facility Type

North American Office/Manufacturing/Research & Development/Testing Pits/Warehouse and Shipping

Location

2201 North Sam Houston Parkway
Houston, TX 77035

Size

30,000 sq ft (2-Story) of Office

64,800 sq ft Manufacturing/Warehouse with High Piled Storage

"We used a well point system and soldier piles to design the 26’ deep test pit. This was challenging because of the 70 tons of overhead crane load and the 12’ water table."

Todd Hlavinka

Project Manager

 

 

Overview

  • The consolidation of multiple properties created the 14-acre site located on the North Beltway.

Need/Problem

  • Project started with eight (8) acres and a single story office attached to the shop.
  • Halfway through project the client discovered they needed more space.
  • The client needed the ability to test large components under water.

KDW Solution

  • Added six (6) acres to the site and a second floor to the office portion of the building.
  • Installed test pits that range from 10' to 26' below finished floor of concrete soldier piles; piles drill down to 70 ft. below finished floor and have cast in place walls using a waterproofing admixture.
Fill out my online form.
Aker Solutions | Final Photo
Aker Solutions | Final Photo
Aker Solutions | Piping
Aker Solutions | Piping
Aker Solutions | Distribution Center
Aker Solutions | Distribution Center
Aker Solutions | Distribution 2
Aker Solutions | Distribution 2
Aker Solutions | Test Pit
Aker Solutions | Test Pit
Aker Solutions | Test Pit 2
Aker Solutions | Test Pit 2

Aker Solutions

Facility Type

North American Office/Manufacturing/Research & Development/Testing Pits/Warehouse and Shipping

Location

2201 North Sam Houston Parkway
Houston, TX 77035

Size

30,000 sq ft (2-Story) of Office

64,800 sq ft Manufacturing/Warehouse with High Piled Storage

"We used a well point system and soldier piles to design the 26’ deep test pit. This was challenging
because of the 70 tons of overhead crane load and the 12’ water table."

Todd Hlavinka

Project Manager

 

Overview

  • The consolidation of multiple properties created the 14-acre site located on the North Beltway.

Need/Problem

  • Project started with eight (8) acres and a single story office attached to the shop.
  • Halfway through project the client discovered they needed more space.
  • The client needed the ability to test large components under water.

KDW Solution

  • Added six (6) acres to the site and a second floor to the office portion of the building.
  • Installed test pits that range from 10' to 26' below finished floor of concrete soldier piles;
    piles drill down to 70 ft. below finished floor and have cast in place walls using a waterproofing admixture.

 

 

Aker Solutions | Final Photo
Aker Solutions | Final Photo
Aker Solutions | Piping
Aker Solutions | Piping
Aker Solutions | Distribution Center
Aker Solutions | Distribution Center
Aker Solutions | Distribution 2
Aker Solutions | Distribution 2
Aker Solutions | Test Pit
Aker Solutions | Test Pit
Aker Solutions | Test Pit 2
Aker Solutions | Test Pit 2