  • KDW designed/built a new manufacturing and warehouse facility on the existing Seatex Campus.
  • The addition includes warehouse, manufacturing, and shipping space.
  • Due to the storage of hazardous materials, the entire floor slopes to a containment drain in the middle, and is designed to hold up to 85,000 gallons of liquid.
  • The facility includes 14 OH door loading docks.

Need/Problem

  • The client needed additional storage and shipping facility on an existing campus.
  • Limited space on the site for construction.
  • Coordinate all construction activities not to disrupt day-to-day operations of existing facility.

KDW Solution

  • Design & construct the facility to accommodate the client’s current and future requirements.
  • KDW worked closely with the client to maximize available land on the existing campus to allow for the largest facility given the limited space available.
  • KDW coordinated all construction activities with the client and facility management to minimize the impact on day-to-day operations (i.e. all concrete pours were completed on the weekend or prior to the beginning of daily operations).

 

Fill out my online form.

Seatex Corp.

Facility Type

PEMB

Location

Rosenberg, Texas

Size

66,000 sq ft

Overview

  • KDW designed/built a new manufacturing and warehouse facility on the existing Seatex Campus.
  • The addition includes warehouse, manufacturing, and shipping space.
  • Due to the storage of hazardous materials, the entire floor slopes to a containment drain in the middle, and is designed to hold up to 85,000 gallons of liquid.
  • The facility includes 14 OH door loading docks.

Need/Problem

  • The client needed additional storage and shipping facility on an existing campus.
  • Limited space on the site for construction.
  • Coordinate all construction activities not to disrupt day-to-day operations of existing facility.

KDW Solution

  • Design & construct the facility to accommodate the client’s current and future requirements.
  • KDW worked closely with the client to maximize available land on the existing campus to allow for the largest facility given the limited space available.
  • KDW coordinated all construction activities with the client and facility management to minimize the impact on day-to-day operations (i.e. all concrete pours were completed on the weekend or prior to the beginning of daily operations).