Other Projects |
 |
| Automated Logic |
Removed and replaced approximately 250 Lft.
of existing expansion joint sealant. |
 |
| CapNet |
10,309 sf of
first-generation interior build-out. |
 |
| Cooper Healthcare |
Converted storage closet into product-display
showroom. |
 |
| Cumberland Monument Sign |
Installation of masonry and pre-cast monument sign. |
 |
| Delta P
|
Renovation of an existing office space for a new tenant
layout. The existing carpet, VCT and rubber base were replaced, all drywall
partitions were painted, a drinking fountain was installed as were new light fixtures and a reception desk. |
 |
| Goya Foods
|
Repair of rod iron fence and integral split-face columns. |
 |
| Goya Foods
|
Design and installation of full-service outdoor kitchen,
including cedar pergola. |
 |
| Growth Force
|
Modular furniture modification and electrical and data
receptacle relocation in an occupied building.
Honeywell
West Road – Conversion of an existing office/work station area into a
product showroom. |
 |
| HARC
|
Conversion of storage space into an engine testing
facility. |
 |
| Honeywell - Bay Area
|
Redesigned existing work space to
allow for additional employees. |
 |
| IPS Winding Room
|
Converted existing manufacturing area into a Clean Room
type space. |
 |
| LEDCOR
|
Replaced carpet, painted all walls, and adjusted office
layout. |
 |
| Mid South Metals
|
Corrected deficiencies as reported by the City of Houston
Occupancy Department. |
 |
| MI Swaco
|
Relocated doors and adjusted office layout to accommodate
new tenant. |
 |
| Oak Forest Lumber
|
Removed and replaced approximately 2,500 sf of existing concrete paving. |
 |
| Parkway Realty
|
Modified existing steel flood gate at parking garage entry. |
 |
Transocean
|
6,192 sf conversion of an
existing lean-to structure to a saw shop. The work was all done around the
existing manufacturing operation. The project consisted of hooking up
owner-furnished equipment, insulating the existing interior roof, saw cutting
and pouring back approximately 100’ of French drains with removable grates,
and the installation of a collection tank with submersible pump. |
 |
| University Space Research Association (USRA)
|
7,000 sf of 2nd-floor interior
office remodel. The Project included expansion of the executive office with
removal of existing restroom, reconfiguration of lighting, HVAC equipment,
and the fire sprinkler heads, removal and re-installation of millwork. |
 |
| UPS Storage
|
Addition of a storage building. |
 |
| VAM USA
|
Striping of approximately 1223' of pedestrian walkway,
striping approximately 1220' of crosshatching and stenciling (4) stop bars
with "STOP" on pavement. |
 |
| VAM USA Building II
|
3,470 sf conversion of an
existing office space to a multi-department modular furniture space. The
Project included 3,200 sf of acoustical ceiling
grid and tile, 20 Lft. of custom fabricated
training room millwork, motion lighting, installation of eight windows, and
painting the "VAM USA" scheme. |
 |
| VAM USA Building III
|
5,018 sf remodel and reconfigure
of an existing gauge lab. The Project included 4,659 sf of acoustical ceiling grid and tile, 30 Lft. of
custom fabricated training room millwork, 34 electrical receptacles,
relocation and demolition of under grid walls and HVAC grills and ductwork.
Existing restroom plumbing was replaced and new restroom fixtures and
partitions were installed. |
 |
| Woodcreek
|
KDW completed a 3,046 sf first generation interior build-out for WoodCreek Office Partners I, Ltd. in Houston, Texas.
Duration of construction was two months. |
 |
| Welspun
|
2,612 sf of first generation
interior build-out. |
 |