ACCURATE COSTS EVERY STEP OF THE WAY
The backbone of any construction organization is its estimating capabilities, so we prioritize accuracy and it starts with the initial concept design. Each phase of the design process must be estimated correctly to ensure that the design is tracking properly with the budget at every level, ensuring that there are no surprise costs or necessary re-designs. Our use of Timberline software and historical data provides precise cost estimation which is used as a monitoring mechanism to identify changes in the project scope and address increases or decreases in the construction costs. Our goal is to work diligently with the design team and the owner’s representative to achieve the best possible balance of cost and quality throughout each phase and conclude with a fair and equitable contract sum.