Accredo Packaging, Inc.
Accredo Packaging, Inc.
Accredo Packaging, Inc.
Accredo Packaging, Inc.
Accredo Packaging, Inc.
Accredo Packaging, Inc.
Accredo Packaging, Inc.
Accredo Packaging, Inc.
Accredo Packaging, Inc.
Accredo Packaging, Inc.
Accredo Packaging, Inc.

Accredo Packaging, Inc.

Project Notes

  • Facility Type
    World Manufacturing Headquarters

  • Location
    12682 Cardinal Meadows Drive Sugar Land, TX

  • Size
    700,000 sq. ft.

  • Site
    31.9 acres

Accredo Packaging, Inc. Overview

Phase I

  • The LEED Silver accredited facility consists of a 6,664 sq. ft. office (includes lab and product testing space), 3,000 sq. ft. ink room, 104,268 sq. ft. of conditioned manufacturing/distribution area with sophisticated chilled water system, and 44,500 sq. ft. non-conditioned dock high warehouse.
  • 4,000 amps of underground service supplies the entire facility.
  • All equipment runs off of chilled water.
  • Two, 500-ton Trane air-cooled chillers for manufacturing production equipment.
  • Specialty foundations (50'W x 96'L x 30"D in size) to bear the load of heavy equipment were installed in the manufacturing area.
  • Ink Room includes a four-foot-high concrete wall and spill barriers at overhead door and main door around the room to contain the ink inside if there were a spill.
  • Blowout panels were installed in the exterior and blowout relief panels were installed at the roof in case an explosion were to occur. A special foam sprinkler system was also installed in this area.

Phase II

  • The addition of a 155,263 sq. ft. warehouse facility and a 17,837 sq. ft. two-story office.
  • Warehouse consists of a load-bearing concrete tilt wall and a structural steel main frame.


Phase III

  • KDW added a 200,840 sq. ft. building to Accredo's campus.
  • 165,000 sq. ft. of warehouse and office space and 35,840 sq. ft. of manufacturing space.
  • Two new rail spurs to service Accredo's Phase III building and nearly 1,800 track footage.

All Industries


Special Projects include ground-up projects, interior build-outs, renovations, expansions, structural repairs, specialty foundations, site upgrades, and more. No matter the size or complexity of the project, KDW's Special Projects Team brings a level of time/cost efficiency that is unmatched.

KDW has worked with us on two of our facilities, and we have been more than pleased both times. Their expertise in building for companies in the manufacturing industry resulted in facilities that were optimized for our purposes, resulting in smart layouts and highly-efficient spaces. When it comes to customer service, KDW has been affordable, personable, and timely. We highly recommend KDW for your company’s design/building projects.

BAUER Equipment America

When Goya realized the need for a large facility capable of heavy production, we knew KDW would be our designs/builder and Houston would be our home. This is our second project in 6 years with KDW and the Goya team considers the KDW team part of our extended family."

Evelio Fernandez

Vice President

Goya Foods

The work and craftsmanship executed by the KDW team is truly inspiring and remarkable.They have a way of making what seems nearly impossible, possible and turning your dream into a reality. Their ability to adapt and meet strict deadlines will astonish you. They were an integral part to the true success of our construction phase and allowed us to become the Premier Water Park in Austin.

Ty Weitzel

General Manager

Typhoon Texas - Austin

In 2013 WIKA Process Solutions LP and GAYESCO INTERNATIONAL LCC started working with the KDW team to design & build our brand new manufacturing facility on a 13 acre lot in the Pasadena ship channel area. From start (concept & initial renderings) to finish (January 2015 moving in) the KDW team supported us in every step of the way.

Paul Lemmens

Wika

I have worked with KDW for over 12 years on very large and small projects. They are skilled at analyzing our needs and offering multiple solutions for a project. Great company and I enjoy working with them.

Michael Sabados

Strategic Projects Manager

NOV

Throughout the different phases of construction, one thing impressed us the most was your focus in honoring your commitments. Secondly, The art of making a very complex project simple is a concept you have gracefully mastered.  We not only made the right choice with KDW we found a new partner.

Evan Barnett

General Manager

Typhoon Texas

Get In
Touch

Contact Us

KDW | Design. Build. Beyond.

Houston Office

5858 Westheimer, Suite 150, Houston, TX 77057

Phone: 713-541-5070 | Fax: 713-541-5072

East Texas Office

312 Old Tyler Road, Nacogdoches, TX 75961

Phone: 936-564-3329 | Fax: 936-569-7544