Project Notes
-
Project Type
Utility Bridge -
Location
Sugar Land, TX
Accredo Utility Bridge Overview
- KDW was tasked with building Accredo's utility bridge that is used to transport chilled water to support the new chiller systems of Phase III.
- This will house future compressed air and resin lines will be used interchangeably between the two buildings.