Project Notes

  • Facility Type
     Headquarters

  • Location
    Brookshire, TX

  • Size
    51,000 SF

  • Site
    5.5 acres

Apex AgChem Overview

  • KDW was tasked to design and build the new 51,000 SF tilt wall facility that will be the new headquarters for Apex AgChem, a leader in the Agricultural Chemical Business.
  • The new building has three manufacturing lines and a monorail crane loop for picking up super sacks of raw products.
  • In addition, the building will house 5,000 SF of corporate build-out, 29,000 SF of warehouse space, and 17,000 SF of mixing/blending area that is explosion-proof.

KDW has been a true partner to our business since 2013. From small projects, complicated projects, to the largest projects in our business, KDW has been our single resource for success in the growth of our facilities. Their team brings vision, integrity, teamwork, and a true partnership to every aspect of our relationship. KDW is our single source for our development and contractor needs in all of Texas.

Bill Ader

Capital Projects Manager

Oldcastle Infrastructure, Inc.

When Goya realized the need for a large facility capable of heavy production, we knew KDW would be our designs/builder and Houston would be our home. This is our second project in 6 years with KDW and the Goya team considers the KDW team part of our extended family."

Evelio Fernandez

Vice President

Goya Foods

KDW has worked with us on two of our facilities, and we have been more than pleased both times. Their expertise in building for companies in the manufacturing industry resulted in facilities that were optimized for our purposes, resulting in smart layouts and highly-efficient spaces. When it comes to customer service, KDW has been affordable, personable, and timely. We highly recommend KDW for your company’s design/building projects.

BAUER Equipment America

Working with KDW to build our state of the art High Bay/Heavy Lift Fabrication Shop was nothing short of pleasurable and professional.  Their knowledge of construction techniques is amazing and every sub-contractor that was used did impeccable work. We could not have chosen a more competent General Contractor on our million dollar expansion project.

Glenn R. Tackaberry

President

Dooley Tackaberry, Inc.

KDW was the best choice for our Design-Build we could ever make. From early on, they guided us through this enormous process of defining and designing the perfect building for our needs. Their expertise and experience makes it easy to make the necessary decisions to get the job done and deliver on time the best results possible – the perfect building to grow our business!

Florian Schiller

MAN Diesel

In 2013 WIKA Process Solutions LP and GAYESCO INTERNATIONAL LCC started working with the KDW team to design & build our brand new manufacturing facility on a 13 acre lot in the Pasadena ship channel area. From start (concept & initial renderings) to finish (January 2015 moving in) the KDW team supported us in every step of the way.

Paul Lemmens

Wika

Get In
Touch

Contact Us

KDW | Design. Build. Beyond.

Houston Office

5858 Westheimer, Suite 150, Houston, TX 77057

Phone: 713-541-5070 | Fax: 713-541-5072

Central Texas Office

3508 Far West Blvd., Suite 300, Austin, TX 78731

Phone: 512-956-5353 | Fax: