Bauer

Bauer
Bauer
Bauer
Bauer
Bauer
Bauer

Project Notes

  • Facility Type
    Manufacturing

  • Location
    Conroe, TX

  • Size
    365,974 sq ft

  • Size
    100 acres

Bauer Overview

  • Bauer, a 200-year old German company, is one of the world's largest manufacturers of foundation equipment. The KDW team assisted Bauer in locating the ideal property in Conroe for building the company's North American Headquarters.
  • The campus is located in the Conroe Business Park just north of Houston, sitting on 80 acres. The facility was built in phases, the first of which consisted of over 200,000 sq. ft.
  • The KDW team utilized clean, low-emission materials arranged in modern, forward-thinking methods to reflect Bauer's distinct German culture and heritage.
  • KDW designed and recreated several pieces of machinery exclusive to Bauer's German operations.
  • The facility is not LEED Certified at the request of the client, but could pass certification at any time.
  • Bauer's manufacturing facility has been designed/built with future expansion needs in mind.
  • In 2014, a 27,200 sq. ft. small parts storage building was added to the campus to create Bauer PileCo.

Bauer - Pileco Overview

  • The new North American Headquarters for Bauer Pileco, a global provider of foundation equipment and support to the foundation construction industry, is a 78,774 sq. ft. facility in Conroe Park North.
  • The new location, with three stories of office space, warehouse and service building space, was designed and built by KDW.
  • Construction at the 18.6-acre site began fall 2017, with completion in April 2018.
  • The addition of the PileCo Small Parts Storage building included paving, site utilities, and 60,000 sq. ft. of laydown yard.


All Industries

Special Projects include ground-up projects, interior build-outs, renovations, expansions, structural repairs, specialty foundations, site upgrades, and more. No matter the size or complexity of the project, KDW's Special Projects Team brings a level of time/cost efficiency that is unmatched.

KDW has worked with us on two of our facilities, and we have been more than pleased both times. Their expertise in building for companies in the manufacturing industry resulted in facilities that were optimized for our purposes, resulting in smart layouts and highly-efficient spaces. When it comes to customer service, KDW has been affordable, personable, and timely. We highly recommend KDW for your company’s design/building projects.

BAUER Equipment America

Throughout the different phases of construction, one thing impressed us the most was your focus in honoring your commitments. Secondly, The art of making a very complex project simple is a concept you have gracefully mastered.  We not only made the right choice with KDW we found a new partner.

Evan Barnett

General Manager

Typhoon Texas

In 2013 WIKA Process Solutions LP and GAYESCO INTERNATIONAL LCC started working with the KDW team to design & build our brand new manufacturing facility on a 13 acre lot in the Pasadena ship channel area. From start (concept & initial renderings) to finish (January 2015 moving in) the KDW team supported us in every step of the way.

Paul Lemmens

Wika

KDW built our new shop addition. They helped me with the Design and planning of the build. They did a wonderful job from the beginning to the end. I would highly recommend KDW and Rolf for any construction needs. They are a top notch company and I am proud to tell people who built our building and very proud of our new shop.

Chris Bull

Collision Center Manager

Tommie Vaughn Ford Collision

Working with KDW to build our state of the art High Bay/Heavy Lift Fabrication Shop was nothing short of pleasurable and professional.  Their knowledge of construction techniques is amazing and every sub-contractor that was used did impeccable work. We could not have chosen a more competent General Contractor on our million dollar expansion project.

Glenn R. Tackaberry

President

Dooley Tackaberry, Inc.

KDW was the best choice for our Design-Build we could ever make. From early on, they guided us through this enormous process of defining and designing the perfect building for our needs. Their expertise and experience makes it easy to make the necessary decisions to get the job done and deliver on time the best results possible – the perfect building to grow our business!

Florian Schiller

MAN Diesel

Get In
Touch

Contact Us

KDW | Design. Build. Beyond.

Houston Office

5858 Westheimer, Suite 150, Houston, TX 77057

Phone: 713-541-5070 | Fax: 713-541-5072

East Texas Office

312 Old Tyler Road, Nacogdoches, TX 75961

Phone: 936-564-3329 | Fax: 936-569-7544