Goya Foods North American Processing Center
Goya Foods North American Processing Center
Goya Foods North American Processing Center
Goya Foods North American Processing Center
Goya Foods North American Processing Center
Goya Foods North American Processing Center

Goya Foods North American Processing Center

Project Notes

  • Facility Type
    Bean Cannery/Corporate
    Office/Processing & Distribution
    Centers/Wastewater Treatment Plant

  • Location
    Brookshire, TX

  • Size
    704,000 sq. ft.

  • Site
    130 acres

Goya Foods North American Processing Center Overview

Phase I

  • KDW upgraded the existing distribution facility with a larger distribution center accompanied by a cannery of equal size. The new 160,000 sq. ft. distribution center is now adjoined to a 160,000 sq. ft. production floor, both with their own corporate office, suites and staff.
  • In addition to the building, KDW is the designer/builder for the supporting infrastructure including a storm drainage system, road improvements, wastewater treatment plant, rail spur and rail dock. The facility includes several "satellite" buildings to house sophisticated water pumps, boiler tanks, outdoor processing, refrigeration equipment and hydrostatic cooking tower.
  • Goya Food's new production facility is strategically located in the south central U.S. to drive Goya's growth in the U.S. and Mexico markets. The location in Brookshire provides access to rail spur, the Port of Houston and abundant ground water.
  • The new facility and specialized equipment allow the company the capability of processing 1,000 cans of beans per minute, with 22 truck dock positions for domestic and international distribution.
  • Energy efficient lighting, natural lighting and daylight harvesting were implemented in the design.
  • The design of the outdoor kitchen is a distinguishing feature and area on campus. The modern feel, relaxed atmosphere and stunning architectural landscape make this space perfect for employee gatherings, community events and Goya's client base.
  • The site was selected with future expansion of distribution, production and future product lines in mind.

Phase II Expansion

  • Goya Foods wanted to expand its North American Processing Center in Brookshire by adding 324,000 sq. ft. of production warehouse, distribution warehouse, production office and auxiliary buildings.
  • The expansion almost doubles Goya's existing 380,000 sq. ft. facility where the company produces more than 2,500 high-quality, affordable food products.
  • The expanded facility features 21 new truck dock positions for domestic and international distribution.

All Industries

Special Projects include ground-up projects, interior build-outs, renovations, expansions, structural repairs, specialty foundations, site upgrades, and more. No matter the size or complexity of the project, KDW's Special Projects Team brings a level of time/cost efficiency that is unmatched.

People make the company.  The folks at KDW are talented, professional, friendly, and second to none.  In spite of the full book of business they keep, I never once felt like my calls were ignored, rushed, or unimportant.  Architects, project managers, superintendents.....they were all top-notch.  Our design/build experience with KDW exceeded all our expectations.

Jeff Olchesky

Pine Cove

I have worked with KDW for over 12 years on very large and small projects. They are skilled at analyzing our needs and offering multiple solutions for a project. Great company and I enjoy working with them.

Michael Sabados

Strategic Projects Manager

NOV

We could not have picked a better partner, to help us in establishing a productive plant in SW Houston. KDW met with us several times, to develop an understanding of our needs. Once understood, they incorporated our proven program with their local knowledge of Municipality, available Materials, Sub Contractors, and other Project Management Guidance.

Kent Keebler

Project Manager

LKQ Corporation

KDW was the best choice for our Design-Build we could ever make. From early on, they guided us through this enormous process of defining and designing the perfect building for our needs. Their expertise and experience makes it easy to make the necessary decisions to get the job done and deliver on time the best results possible – the perfect building to grow our business!

Florian Schiller

MAN Diesel

Working with KDW to build our state of the art High Bay/Heavy Lift Fabrication Shop was nothing short of pleasurable and professional.  Their knowledge of construction techniques is amazing and every sub-contractor that was used did impeccable work. We could not have chosen a more competent General Contractor on our million dollar expansion project.

Glenn R. Tackaberry

President

Dooley Tackaberry, Inc.

Throughout the different phases of construction, one thing impressed us the most was your focus in honoring your commitments. Secondly, The art of making a very complex project simple is a concept you have gracefully mastered.  We not only made the right choice with KDW we found a new partner.

Evan Barnett

General Manager

Typhoon Texas

Get In
Touch

Contact Us

KDW | Design. Build. Beyond.

Houston Office

5858 Westheimer, Suite 150, Houston, TX 77057

Phone: 713-541-5070 | Fax: 713-541-5072

East Texas Office

312 Old Tyler Road, Nacogdoches, TX 75961

Phone: 936-564-3329 | Fax: 936-569-7544