Project Notes

  • Location
    Baytown, TX

  • Site
    156.38 acres

Jindal Saw Overview

  • KDW is installing natural gas and water lines in the Heat Treat building.
  • Installation of 4 (EA) Exterior Concrete Foundations at Heat Treat Building
  • Interior & Exterior Build Out of a multi-level Pulpit in Heat Treat Building
  • Turn-Key construction of 3 (EA) Operator Cabins in the ERW Building
  • Installation of 800' (LF) of 24" HDPE Storm Line & 1 (EA) Area Inlet
  • Repair and replace damaged Roof Sheets at the ERW Building
  • ERW Building Domestic Water Tie-Ins
  • Replace Well Water System with new Process Waterline and RPZ Backflow Preventer
  • Construct a new Pipe Exit Canopy at Heat Treat Building
  • 21,852 LF of Domestic/Fire Water and Sanitary Sewer (7' to 22' deep)
  • (3 ea) Roadbores totaling 283 LF
  • (23 ea) Fire Hydrants
  • (33 ea) Manholes

Working with KDW to build our state of the art High Bay/Heavy Lift Fabrication Shop was nothing short of pleasurable and professional.  Their knowledge of construction techniques is amazing and every sub-contractor that was used did impeccable work. We could not have chosen a more competent General Contractor on our million dollar expansion project.

Glenn R. Tackaberry

President

Dooley Tackaberry, Inc.

The work and craftsmanship executed by the KDW team is truly inspiring and remarkable.They have a way of making what seems nearly impossible, possible and turning your dream into a reality. Their ability to adapt and meet strict deadlines will astonish you. They were an integral part to the true success of our construction phase and allowed us to become the Premier Water Park in Austin.

Ty Weitzel

General Manager

Typhoon Texas - Austin

JDR recently partnered with KDW on a build to suit lease for a purpose designed facility to support the growing needs of our expanding business. We could not have been more pleased with the support from their team and the seamless process from the front-end conceptualization phase to the final walkthrough. The integrated model KDW utilizes ensured that the end result met our business needs in line with the agreed budget. I would recommend KDW to anyone considering a new facility project due to their straightforward approach and outstanding level of service.

Brian Davis

General Manager

JDR Cable Systems

In 2013 WIKA Process Solutions LP and GAYESCO INTERNATIONAL LCC started working with the KDW team to design & build our brand new manufacturing facility on a 13 acre lot in the Pasadena ship channel area. From start (concept & initial renderings) to finish (January 2015 moving in) the KDW team supported us in every step of the way.

Paul Lemmens

Wika

KDW built our new shop addition. They helped me with the Design and planning of the build. They did a wonderful job from the beginning to the end. I would highly recommend KDW and Rolf for any construction needs. They are a top notch company and I am proud to tell people who built our building and very proud of our new shop.

Chris Bull

Collision Center Manager

Tommie Vaughn Ford Collision

KDW has worked with us on two of our facilities, and we have been more than pleased both times. Their expertise in building for companies in the manufacturing industry resulted in facilities that were optimized for our purposes, resulting in smart layouts and highly-efficient spaces. When it comes to customer service, KDW has been affordable, personable, and timely. We highly recommend KDW for your company’s design/building projects.

BAUER Equipment America

Get In
Touch

Contact Us

KDW | Design. Build. Beyond.

Houston Office

5858 Westheimer, Suite 150, Houston, TX 77057

Phone: 713-541-5070 | Fax: 713-541-5072

East Texas Office

312 Old Tyler Road, Nacogdoches, TX 75961

Phone: 936-564-3329 | Fax: 936-569-7544