Project Notes
-
Location
Baytown, TX -
Site
156.38 acres
Jindal Saw Overview
- KDW is installing natural gas and water lines in the Heat Treat building.
- Installation of 4 (EA) Exterior Concrete Foundations at Heat Treat Building
- Interior & Exterior Build Out of a multi-level Pulpit in Heat Treat Building
- Turn-Key construction of 3 (EA) Operator Cabins in the ERW Building
- Installation of 800' (LF) of 24" HDPE Storm Line & 1 (EA) Area Inlet
- Repair and replace damaged Roof Sheets at the ERW Building
- ERW Building Domestic Water Tie-Ins
- Replace Well Water System with new Process Waterline and RPZ Backflow Preventer
- Construct a new Pipe Exit Canopy at Heat Treat Building
- 21,852 LF of Domestic/Fire Water and Sanitary Sewer (7' to 22' deep)
- (3 ea) Roadbores totaling 283 LF
- (23 ea) Fire Hydrants
- (33 ea) Manholes