Project Notes

  • Facility Type
    North American Headquarters

  • Location
    Brookshire, TX

  • Size
    137,665 sq. ft.

  • Site
    16.4 acres

MAN Energy Solutions Overview

  • MAN Energy Solutions' new North America headquarters, a build-to-suit space, houses 108,000 sq. ft. of air-conditioned manufacturing space and 32,337 sq. ft. of office.
  • Located in the Twinwood Business Park, a new west Houston destination for companies dedicated to research and development, distribution and light manufacturing.
  • The Augsburg, Germany-based manufacturer of marine propulsion systems and turbomachinery units combined its two operations in Houston and Deer Park in order to broaden its manufacturing capabilities in the new Twinwood location.
  • Half of the world's trade is powered by MAN engines, including those which power the CSCL Globe, one of the world's largest container ships capable of storing 19,100 containers, and Pioneering Spirit, the world's largest vessel ever built in terms of gross tonnage, breadth and displacement. MAN Energy Solutions also supplied the engines for the first container ships to be powered primarily by liquid natural gas.

All Industries

Special Projects include ground-up projects, interior build-outs, renovations, expansions, structural repairs, specialty foundations, site upgrades, and more. No matter the size or complexity of the project, KDW's Special Projects Team brings a level of time/cost efficiency that is unmatched.

KDW was the best choice for our Design-Build we could ever make. From early on, they guided us through this enormous process of defining and designing the perfect building for our needs. Their expertise and experience makes it easy to make the necessary decisions to get the job done and deliver on time the best results possible – the perfect building to grow our business!

Florian Schiller

MAN Diesel

When Goya realized the need for a large facility capable of heavy production, we knew KDW would be our designs/builder and Houston would be our home. This is our second project in 6 years with KDW and the Goya team considers the KDW team part of our extended family."

Evelio Fernandez

Vice President

Goya Foods

People make the company.  The folks at KDW are talented, professional, friendly, and second to none.  In spite of the full book of business they keep, I never once felt like my calls were ignored, rushed, or unimportant.  Architects, project managers, superintendents.....they were all top-notch.  Our design/build experience with KDW exceeded all our expectations.

Jeff Olchesky

Pine Cove

Throughout the different phases of construction, one thing impressed us the most was your focus in honoring your commitments. Secondly, The art of making a very complex project simple is a concept you have gracefully mastered.  We not only made the right choice with KDW we found a new partner.

Evan Barnett

General Manager

Typhoon Texas

In 2013 WIKA Process Solutions LP and GAYESCO INTERNATIONAL LCC started working with the KDW team to design & build our brand new manufacturing facility on a 13 acre lot in the Pasadena ship channel area. From start (concept & initial renderings) to finish (January 2015 moving in) the KDW team supported us in every step of the way.

Paul Lemmens

Wika

KDW built our new shop addition. They helped me with the Design and planning of the build. They did a wonderful job from the beginning to the end. I would highly recommend KDW and Rolf for any construction needs. They are a top notch company and I am proud to tell people who built our building and very proud of our new shop.

Chris Bull

Collision Center Manager

Tommie Vaughn Ford Collision

Get In
Touch

Contact Us

KDW | Design. Build. Beyond.

Houston Office

5858 Westheimer, Suite 150, Houston, TX 77057

Phone: 713-541-5070 | Fax: 713-541-5072

East Texas Office

312 Old Tyler Road, Nacogdoches, TX 75961

Phone: 936-564-3329 | Fax: 936-569-7544