Project Notes

  • Facility Type
    North American Manufacturing Headquarters

  • Location
    Houston, TX

  • Size
    150,000 sq. ft.

  • Site
    7 acres

MSI Oilfield Products Overview

  • MSI Oilfield Products' new two-story facility consists of 30,000 sq. ft. of office space, 64,000 sq. ft. of air-conditioned manufacturing space and 56,000 sq. ft. of warehouse.
  • The new facility features a state-of-the-art chiller system.
  • The new office space allows all departments to collaborate more efficiently under one roof.
  • A covered canopy was built to allow shipping and receiving to continue in inclement weather.

All Industries

Special Projects include ground-up projects, interior build-outs, renovations, expansions, structural repairs, specialty foundations, site upgrades, and more. No matter the size or complexity of the project, KDW's Special Projects Team brings a level of time/cost efficiency that is unmatched.

KDW has worked with us on two of our facilities, and we have been more than pleased both times. Their expertise in building for companies in the manufacturing industry resulted in facilities that were optimized for our purposes, resulting in smart layouts and highly-efficient spaces. When it comes to customer service, KDW has been affordable, personable, and timely. We highly recommend KDW for your company’s design/building projects.

BAUER Equipment America

Throughout the different phases of construction, one thing impressed us the most was your focus in honoring your commitments. Secondly, The art of making a very complex project simple is a concept you have gracefully mastered.  We not only made the right choice with KDW we found a new partner.

Evan Barnett

General Manager

Typhoon Texas

KDW was the best choice for our Design-Build we could ever make. From early on, they guided us through this enormous process of defining and designing the perfect building for our needs. Their expertise and experience makes it easy to make the necessary decisions to get the job done and deliver on time the best results possible – the perfect building to grow our business!

Florian Schiller

MAN Diesel

In 2013 WIKA Process Solutions LP and GAYESCO INTERNATIONAL LCC started working with the KDW team to design & build our brand new manufacturing facility on a 13 acre lot in the Pasadena ship channel area. From start (concept & initial renderings) to finish (January 2015 moving in) the KDW team supported us in every step of the way.

Paul Lemmens

Wika

When Goya realized the need for a large facility capable of heavy production, we knew KDW would be our designs/builder and Houston would be our home. This is our second project in 6 years with KDW and the Goya team considers the KDW team part of our extended family."

Evelio Fernandez

Vice President

Goya Foods

Working with KDW to build our state of the art High Bay/Heavy Lift Fabrication Shop was nothing short of pleasurable and professional.  Their knowledge of construction techniques is amazing and every sub-contractor that was used did impeccable work. We could not have chosen a more competent General Contractor on our million dollar expansion project.

Glenn R. Tackaberry

President

Dooley Tackaberry, Inc.

Get In
Touch

Contact Us

KDW | Design. Build. Beyond.

Houston Office

5858 Westheimer, Suite 150, Houston, TX 77057

Phone: 713-541-5070 | Fax: 713-541-5072

East Texas Office

312 Old Tyler Road, Nacogdoches, TX 75961

Phone: 936-564-3329 | Fax: 936-569-7544