Oldcastle Precast, Inc.

Oldcastle Precast, Inc.
Oldcastle Precast, Inc.

Project Notes

  • Facility Type
    Office/Manufacturing

  • Location
    2120 FM 359 South, Brookshire, TX 77423

  • Size
    7,626 sq. ft. office
    28,242 sq. ft. manufacturing

  • Site
    Existing 70 acres

Oldcastle Precast, Inc. Overview

  • Oldcastle Precast, Inc. is a leading manufacturer of precast concrete in the U.S.

  • Prior to improvements by KDW, the facility consisted of temporary offices, a wet cast manufacturing facility, a mechanic shop, a batch plant and lay-down yard for product storage.

  • KDW constructed an office facility that eliminated the need for the temporary trailers and boosted the overall morale of the Oldcastle Precast, Inc. employees.

  • KDW worked closely with the Oldcastle Precast team to design/build a manufacturing facility that would increase the efficiency of the wet cast process.

  • The 2-3 feet of concrete debris was removed and replaced with select fill.

  • KDW coordinated the installation of the SKAKO Batch Plant Equipment, including the following components: motor control center, silos, conveyor and a ramp structure with "T Wall" facade to access the aggregate hopper.

  • Improvements included pre-engineered metal buildings, two (2) 15-ton cab cranes, one (1) 7.5-ton crane, a rebar shop, a foam shop and a modern QC lab.

  • The office has upgraded interiors including furniture, VCT, carpet, tile floors, Raco door frames and laminated doors for the restrooms, drywall partitions, etc.

All Industries

Special Projects include ground-up projects, interior build-outs, renovations, expansions, structural repairs, specialty foundations, site upgrades, and more. No matter the size or complexity of the project, KDW's Special Projects Team brings a level of time/cost efficiency that is unmatched.

When Goya realized the need for a large facility capable of heavy production, we knew KDW would be our designs/builder and Houston would be our home. This is our second project in 6 years with KDW and the Goya team considers the KDW team part of our extended family."

Evelio Fernandez

Vice President

Goya Foods

The work and craftsmanship executed by the KDW team is truly inspiring and remarkable.They have a way of making what seems nearly impossible, possible and turning your dream into a reality. Their ability to adapt and meet strict deadlines will astonish you. They were an integral part to the true success of our construction phase and allowed us to become the Premier Water Park in Austin.

Ty Weitzel

General Manager

Typhoon Texas - Austin

KDW has been a true partner to our business since 2013. From small projects, complicated projects, to the largest projects in our business, KDW has been our single resource for success in the growth of our facilities. Their team brings vision, integrity, teamwork, and a true partnership to every aspect of our relationship. KDW is our single source for our development and contractor needs in all of Texas.

Bill Ader

Capital Projects Manager

Oldcastle Infrastructure, Inc.

In 2013 WIKA Process Solutions LP and GAYESCO INTERNATIONAL LCC started working with the KDW team to design & build our brand new manufacturing facility on a 13 acre lot in the Pasadena ship channel area. From start (concept & initial renderings) to finish (January 2015 moving in) the KDW team supported us in every step of the way.

Paul Lemmens

Wika

We could not have picked a better partner, to help us in establishing a productive plant in SW Houston. KDW met with us several times, to develop an understanding of our needs. Once understood, they incorporated our proven program with their local knowledge of Municipality, available Materials, Sub Contractors, and other Project Management Guidance.

Kent Keebler

Project Manager

LKQ Corporation

Working with KDW to build our state of the art High Bay/Heavy Lift Fabrication Shop was nothing short of pleasurable and professional.  Their knowledge of construction techniques is amazing and every sub-contractor that was used did impeccable work. We could not have chosen a more competent General Contractor on our million dollar expansion project.

Glenn R. Tackaberry

President

Dooley Tackaberry, Inc.

Get In
Touch

Contact Us

KDW | Design. Build. Beyond.

Houston Office

5858 Westheimer, Suite 150, Houston, TX 77057

Phone: 713-541-5070 | Fax: 713-541-5072

East Texas Office

312 Old Tyler Road, Nacogdoches, TX 75961

Phone: 936-564-3329 | Fax: 936-569-7544