Setpoint Integrated Solutions, Inc.

Setpoint Integrated Solutions, Inc.
Setpoint Integrated Solutions, Inc.
Setpoint Integrated Solutions, Inc.
Setpoint Integrated Solutions, Inc.
Setpoint Integrated Solutions, Inc.

Project Notes

  • Facility Type
    US Operations Headquarters

  • Location
    19200 Highland Road Baton Rouge, LA 70809

  • Size
    112,329 sq. ft.

  • Site
    10.85 acres

Setpoint Integrated Solutions, Inc. Overview

  • Setpoint Integrated Solutions' U.S. Operations Headquarters in Baton Rouge, LA was a consolidation of multiple locations.
  • KDW was hired to design and build a multi-functioning fabrication and assembly facility that included high-end corporate office space for entertainment and sales purposes.
  • The new location includes a service, repair and assembly facility with executive level finishes located throughout.
  • Specialty components in facility: boiler room, pits, paint booth, O2 clean room and a quality control lab.
  • The fabrication shop is fully air-conditioned with air rotation units.
  • Fabrication and assembly are equipped with two (2) 10-ton cranes, and the facility includes twenty-two (22) JIB cranes.
  • Design and construction was completed in under twelve months (four to six months faster than the typical delivery method).
  • Setpoint's new facility has been designed/built with future expansion needs in mind.

All Industries

Special Projects include ground-up projects, interior build-outs, renovations, expansions, structural repairs, specialty foundations, site upgrades, and more. No matter the size or complexity of the project, KDW's Special Projects Team brings a level of time/cost efficiency that is unmatched.

The work and craftsmanship executed by the KDW team is truly inspiring and remarkable.They have a way of making what seems nearly impossible, possible and turning your dream into a reality. Their ability to adapt and meet strict deadlines will astonish you. They were an integral part to the true success of our construction phase and allowed us to become the Premier Water Park in Austin.

Ty Weitzel

General Manager

Typhoon Texas - Austin

In 2013 WIKA Process Solutions LP and GAYESCO INTERNATIONAL LCC started working with the KDW team to design & build our brand new manufacturing facility on a 13 acre lot in the Pasadena ship channel area. From start (concept & initial renderings) to finish (January 2015 moving in) the KDW team supported us in every step of the way.

Paul Lemmens

Wika

We could not have picked a better partner, to help us in establishing a productive plant in SW Houston. KDW met with us several times, to develop an understanding of our needs. Once understood, they incorporated our proven program with their local knowledge of Municipality, available Materials, Sub Contractors, and other Project Management Guidance.

Kent Keebler

Project Manager

LKQ Corporation

Working with KDW to build our state of the art High Bay/Heavy Lift Fabrication Shop was nothing short of pleasurable and professional.  Their knowledge of construction techniques is amazing and every sub-contractor that was used did impeccable work. We could not have chosen a more competent General Contractor on our million dollar expansion project.

Glenn R. Tackaberry

President

Dooley Tackaberry, Inc.

KDW has worked with us on two of our facilities, and we have been more than pleased both times. Their expertise in building for companies in the manufacturing industry resulted in facilities that were optimized for our purposes, resulting in smart layouts and highly-efficient spaces. When it comes to customer service, KDW has been affordable, personable, and timely. We highly recommend KDW for your company’s design/building projects.

BAUER Equipment America

KDW built our new shop addition. They helped me with the Design and planning of the build. They did a wonderful job from the beginning to the end. I would highly recommend KDW and Rolf for any construction needs. They are a top notch company and I am proud to tell people who built our building and very proud of our new shop.

Chris Bull

Collision Center Manager

Tommie Vaughn Ford Collision

Get In
Touch

Contact Us

KDW | Design. Build. Beyond.

Houston Office

5858 Westheimer, Suite 150, Houston, TX 77057

Phone: 713-541-5070 | Fax: 713-541-5072

East Texas Office

312 Old Tyler Road, Nacogdoches, TX 75961

Phone: 936-564-3329 | Fax: 936-569-7544