Project Notes

  • Facility Type
    Manufacturing/Distribution

  • Location
    Sealy, TX

  • Size
    98,000 sq. ft.

  • Site
    40 acres

Sika Corporation Overview

  • After months of due diligence, negotiations, careful planning and construction, Sika, a 107-year-old international manufacturer with more than 200 factories in 100 countries, has completed the first phase of a state-of-the-art manufacturing campus west of Houston in Sealy. Globally, Sika maintains a leading position in the development and production of systems and products for bonding, sealing, damping, reinforcing and protecting in the building sector and motor vehicle industry.


  • The 40-acre site in Sealy has been master planned as a campus which will include multiple expansions. All phase-one utility systems were engineered and designed to support future stages of growth. A 70-foot tower with multi-story structural steel mezzanine houses the ViscoCrete Polymer manufacturing process. The Admixture area includes two semi-truck drive-thru lanes. Both processes are isolated with concrete tiltwalls and include containment provisions due to the H3 Occupancy classification. The Mortars process also has a 70-foot tower with manufacturing mezzanine and specialized equipment with robotic automation. Just outside the Mortars Tower sits an array of silos that reach almost 90 feet above the finished floor. All manufacturing align on one side of the plant and all warehousing and distribution align on the other for effective product flow.


  • Phase one of the master plan included the design and construction of a new manufacturing plant with three product lines - one producing high-performance mortars and grouts, a second for high-performance ViscoCrete Polymers and a third yielding a wide range of liquid concrete admixtures. The office complex is designated for collaborative interaction with management, operations and sales teams, with laboratories and a training center to educate customers and applicators on Sika's technologies.

All Industries


Special Projects include ground-up projects, interior build-outs, renovations, expansions, structural repairs, specialty foundations, site upgrades, and more. No matter the size or complexity of the project, KDW's Special Projects Team brings a level of time/cost efficiency that is unmatched.

Working with KDW to build our state of the art High Bay/Heavy Lift Fabrication Shop was nothing short of pleasurable and professional.  Their knowledge of construction techniques is amazing and every sub-contractor that was used did impeccable work. We could not have chosen a more competent General Contractor on our million dollar expansion project.

Glenn R. Tackaberry

President

Dooley Tackaberry, Inc.

KDW has been a true partner to our business since 2013. From small projects, complicated projects, to the largest projects in our business, KDW has been our single resource for success in the growth of our facilities. Their team brings vision, integrity, teamwork, and a true partnership to every aspect of our relationship. KDW is our single source for our development and contractor needs in all of Texas.

Bill Ader

Capital Projects Manager

Oldcastle Infrastructure, Inc.

We could not have picked a better partner, to help us in establishing a productive plant in SW Houston. KDW met with us several times, to develop an understanding of our needs. Once understood, they incorporated our proven program with their local knowledge of Municipality, available Materials, Sub Contractors, and other Project Management Guidance.

Kent Keebler

Project Manager

LKQ Corporation

When Goya realized the need for a large facility capable of heavy production, we knew KDW would be our designs/builder and Houston would be our home. This is our second project in 6 years with KDW and the Goya team considers the KDW team part of our extended family."

Evelio Fernandez

Vice President

Goya Foods

In 2013 WIKA Process Solutions LP and GAYESCO INTERNATIONAL LCC started working with the KDW team to design & build our brand new manufacturing facility on a 13 acre lot in the Pasadena ship channel area. From start (concept & initial renderings) to finish (January 2015 moving in) the KDW team supported us in every step of the way.

Paul Lemmens

Wika

KDW has worked with us on two of our facilities, and we have been more than pleased both times. Their expertise in building for companies in the manufacturing industry resulted in facilities that were optimized for our purposes, resulting in smart layouts and highly-efficient spaces. When it comes to customer service, KDW has been affordable, personable, and timely. We highly recommend KDW for your company’s design/building projects.

BAUER Equipment America

Get In
Touch

Contact Us

KDW | Design. Build. Beyond.

Houston Office

5858 Westheimer, Suite 150, Houston, TX 77057

Phone: 713-541-5070 | Fax: 713-541-5072

East Texas Office

312 Old Tyler Road, Nacogdoches, TX 75961

Phone: 936-564-3329 | Fax: 936-569-7544