Sooner Container

Sooner Container
Sooner Container
Sooner Container
Sooner Container

Project Notes

  • Facility Type
    Warehouse

  • Location
    Conroe, Texas

  • Size
    65,000 sq. ft.

  • Size
    15 acres

Sooner Container Overview

  • Sooner Container's new facility includes 5,000 sq. ft. of corporate office space, 60,000 sq. ft. of high-pile storage and a test lab, including three test pits for high-pressure gas testing.
  • The construction of the project was complete in 180 days.
  • Corporate signage was cast into tilt-wall panels.
  • The site has 5 acres of crushed concrete laydown yard for truck parking.
  • KDW designed the building so that no fire pump was needed for the ESFR fire system.
  • KDW designed the electrical system with 100% back up power from a natural gas generator.

All Industries

Special Projects include ground-up projects, interior build-outs, renovations, expansions, structural repairs, specialty foundations, site upgrades, and more. No matter the size or complexity of the project, KDW's Special Projects Team brings a level of time/cost efficiency that is unmatched.

KDW was the best choice for our Design-Build we could ever make. From early on, they guided us through this enormous process of defining and designing the perfect building for our needs. Their expertise and experience makes it easy to make the necessary decisions to get the job done and deliver on time the best results possible – the perfect building to grow our business!

Florian Schiller

MAN Diesel

Throughout the different phases of construction, one thing impressed us the most was your focus in honoring your commitments. Secondly, The art of making a very complex project simple is a concept you have gracefully mastered.  We not only made the right choice with KDW we found a new partner.

Evan Barnett

General Manager

Typhoon Texas

When Goya realized the need for a large facility capable of heavy production, we knew KDW would be our designs/builder and Houston would be our home. This is our second project in 6 years with KDW and the Goya team considers the KDW team part of our extended family."

Evelio Fernandez

Vice President

Goya Foods

Working with KDW to build our state of the art High Bay/Heavy Lift Fabrication Shop was nothing short of pleasurable and professional.  Their knowledge of construction techniques is amazing and every sub-contractor that was used did impeccable work. We could not have chosen a more competent General Contractor on our million dollar expansion project.

Glenn R. Tackaberry

President

Dooley Tackaberry, Inc.

The work and craftsmanship executed by the KDW team is truly inspiring and remarkable.They have a way of making what seems nearly impossible, possible and turning your dream into a reality. Their ability to adapt and meet strict deadlines will astonish you. They were an integral part to the true success of our construction phase and allowed us to become the Premier Water Park in Austin.

Ty Weitzel

General Manager

Typhoon Texas - Austin

I have worked with KDW for over 12 years on very large and small projects. They are skilled at analyzing our needs and offering multiple solutions for a project. Great company and I enjoy working with them.

Michael Sabados

Strategic Projects Manager

NOV

Get In
Touch

Contact Us

KDW | Design. Build. Beyond.

Houston Office

5858 Westheimer, Suite 150, Houston, TX 77057

Phone: 713-541-5070 | Fax: 713-541-5072

East Texas Office

312 Old Tyler Road, Nacogdoches, TX 75961

Phone: 936-564-3329 | Fax: 936-569-7544