Project Notes
-
Facility Type
Pipe Handling and Coating -
Location
Houston, TX -
Size
77,000 SF -
Site
10 acres
Tenaris Dopeless Overview
Tenaris Dopeless needed to add to its existing pipe manufacturing building while maintaining its existing operations.
Through coordination with the owner, KDW provided turnkey design/build services to add the 18,000 SF building onto the existing manufacturing facility while meeting the owner's production schedule.
KDW installed owner-furnished pipe handling equipment and piping.
KDW provided troubleshooting and quality control services throughout the process to improve the precision of this line.
All Industries
Special Projects include ground-up projects, interior build-outs, renovations, expansions, structural repairs, specialty foundations, site upgrades, and more. No matter the size or complexity of the project, KDW's Special Projects Team brings a level of time/cost efficiency that is unmatched.